NPAR/TS/02: Timesheet Preparation and Submission Rules

1. Introduction

This document is intended for partner consultants and their account managers (umbrella companies or equivalent) working on assignments operated through Novancy Consulting - Morocco.

It aims to clarify the rules for preparing, validating, and submitting timesheets, as part of our continuous improvement approach to billing processes and support.

⚠️ Important: In case of any discrepancy between this document and your contractual documents (Contract, Purchase Order, etc.), the contractual documents shall prevail.

2. Context

Since September 2023, two key adjustments have been implemented to enhance fluidity and traceability of monthly exchanges:

  • New standardized timesheet template
  • Single email submission channel

These measures aim to ensure faster processing of your supporting documents and optimize the billing cycle.

3. What is a Timesheet?

A timesheet, also known as CRA (Activity Report) or activity record, is a reference document allowing consultants to declare their worked days or hours over a given period — typically monthly.

For time & materials contracts, this document is mandatory and serves to:

  • Certify time actually spent on the project
  • Validate services with the client
  • Trigger monthly billing
  • Ensure contractual tracking of the Purchase Order (PO)

4. Timesheet Template

Novancy provides a standardized timesheet template in Excel format. This template details worked days and activities performed during the service month. 

The timesheet must be completed and submitted for client validation: validation by email and/or signature, according to each client's specific requirements.

Please click the following link to download the TS template.

 TS Template - Novancy Consulting - FR-2023-v3.xlsx

⚠️ Important: If the Client requires their own format, their template takes priority.

5. Client Validation

For certain clients, timesheet validation requires, in addition to the signature, a validation email from the project manager.

This email should contain a clear summary table, including information such as:

  • Consultant Name
  • PO Number and/or Project Name
  • Period
  • Consumed Workload (in person-days)
  • Validating PM

6. Recommended Submission Deadlines

To ensure optimal processing of your billing, we strongly recommend:

  • Submitting your TS to Novancy Consulting by the 5th of the following month at the latest
  • Sending your corresponding invoice subsequently (or simultaneously)

Late submission may delay processing and payment steps.

7. Single Email Address

Since August 30, 2023, a dedicated email address receives all your documents: [email protected]

All validated timesheets and electronic invoices must be sent exclusively through this channel.

This process ensures better tracking, centralized traceability, and processing prioritization.

8. Frequently Asqued Questions 

9. Other questions? 

​Feel free to contact your regular Delivery Director (from Novancy) for any other questions related to timesheets, templates, or submission processes.

10. Document History

  • Created: December 1, 2022
  • Last updated: April 6, 2025